HKS SUPER SQV 4 BLOW OFF VALVES ( 2) BOV NISSAN GTR R35 & Pipes
Stock rubber hoses and cast pipes will be replaced with the polished aluminum SQV pipes that have smooth shape. Although the default blow off valve layout returns to suction pipes, by replacement with attached fins, high frequency blow-off sound can be enjoyed. There is no engine stall problem with the kit.
Vehicle | Model | Engine | Model Year | Body Color | Suction Return Kit | Code No. | Price | Instruction Manual | Remarks |
---|---|---|---|---|---|---|---|---|---|
GT-R | R35 | VR38DETT | 07/12 - | SSQV4 (Silver) | 〇 | 71008-AN027 | Chamber pipe exchange type |
Revving in the cabin | Stock | No sound | S | M | L |
Super SQV | No sound | S | M | L |
Revving outside the cabin | Stock | No sound | S | M | L |
Super SQV | No sound | S | M | L |
Driving revving window closed | Stock | No sound | S | M | L |
Super SQV | No sound | S | M | L |
Driving revving window open | Stock | No sound | S | M | L |
Super SQV | No sound | S | M | L |
- 1.High Quality Aluminum Die-Cast Body
- Silver-coated aluminum die-cast body. Combines the ultimate in looks and durability in the engine compartment.
- 2.High Stiffness Metal Die-Cast Valve
- Secondary valve main portion is made of die cast metal. Reliable operation with beautiful looking.
- 3.Triple Fin design produces "Super Sound"
- Triple Fins set at the center of the funnel produces a dynamic and aggressive sound. An optional special Round Fin can be purchased separately for sound tuning.
- 1.Pull-Type Relief Valve Operation
- The Pull-Type valve operation offers more precise relief of excess boost and is compatible for a wider range of boost pressure compared to typical push-type blow off valves.
- 2.Primary Valve (Small)
- Lift off the throttle, and the primary valve instantly opens, quickly discharging initial excess boost pressure.
- 3.Secondary Valve (Large)
- This valve combined with the Primary Valve from the sequential dual valve structure. Optimal blow-off operation from how to high boost ranges without leaking.
Dual Valve Structure, Sequential System
At low boost ranges the Primary Valve opens, and at high boost ranges the Secondary Valve also opens, resulting in linear response and optimal blow-off operation at all boost levels.
-
Accelerator ON
Valves ClosedAs pressure rises in chamber C, pressure is applied to both the Primary and Secondary valves. The higher the boost pressure, the more pressure is applied to the valves, preventing leaks.
-
Accelerator OFF
Primary Valve OpensThrottle lift creates a pressure difference between chambers A & B, opening the primary valve bypassing the secondary valve. this creates the initial discharge.
-
Accelerator OFF
Secondary Valve OpensWhen pressure difference in chambers A & B reach a maximum, the Primary Valve pulls the Secondary Valve open, creating a secondary discharge.
Pull-Type blow off valves will work for any turbocharged vehicle, from stock to highly tuned.
Typical push-type blow off valves require spring load settings for each vehicle specification. If the spring load setting is too low, the valve may leak under high boost and the desired boost setting may not be reach. If the spring load setting is too strong, it may not open at low boost. The Super SQV will operate under any boost pressure setting without leaking.